Golestan Project

Golestan stream project The target was to transferring the surface water entering from south east of Tabriz (Golestan stream) to Eeal Goli road. The path length was nearly 2 km in a crowded recreational site Eel Goli Park. The initial design included of a concrete box with dimension of 2x2 m. due to the heavy traffic, the weight of the prefabricated compartments (about 12 ton) and Existing the barriers in the past, execution seemed to be so critical. PROFILEEN® pipes were a great alternative to the concrete ones regarding to the lightness and simplicity of installation.

Print Email

South Pars / North Dome Gas-Condensate field-Phases 15 and 16

Phases 15 and 16 development was awarded to Khatam al-Anbia.[42] These phases will produce 2 billion cubic feet (57 million cubic metres) per day of natural gas, 75 million cubic feet (2.1 million cubic metres) of ethane, 80,000 barrels per day (13,000 m3/d) of natural gas condensate, 3,000 tons of LPG per day plus 400 tons of sulfur per day. In July 2010, the project was transferred to Iran Shipbuilding & Offshore Industries Complex. At that time, the $2 billion project was already 50% complete.[43] Phase 15 & 16 will be completed by March 2012.[

Print Email

South Pars / North Dome Gas-Condensate field-Phases 17 and 18

Phases 17 and 18 development was assigned to a consortium of Oil Industrial Engineering and Construction Company (OIEC), Iran Offshore Engineering and Construction (IOEC) and Petropars. These phases will produce 2 billion cubic feet (57 million cubic metres) per day of natural gas, 75 million cubic feet (2.1 million cubic metres) of ethane, 80,000 barrels per day (13,000 m3/d) of natural gas condensate, 3,000 tons of LPG per day plus 400 tons of sulfur per day. Phase 17 & 18 will be completed by March 2012.

Print Email

South Pars / North Dome Gas-Condensate field-Phases 20 and 21

Phases 20 and 21 development was awarded to OIEC.[46] 2 billion cubic feet (57 million cubic metres) per day of natural gas, 75 million cubic feet (2.1 million cubic metres) of ethane, 80,000 barrels per day (13,000 m3/d) of natural gas condensate, 3,000 tons of LPG per day plus 400 tons of sulfur per day. In May 2008, Repsol and Royal Dutch Shell agreed to exchange block 13 with block 20 or 21

Print Email

South Pars / North Dome Gas-Condensate field-Phases 13,22 and 24

Phases 22, 23 and 24 were awarded to Khatam al-Anbia, Petro Sina Arian and SADRA and are located in the north-eastern frontier of the field.[40][48] The aim of phases 22, 23 and 24 development is to produce 42.5 million cubic metres (1.50 billion cubic feet) per day of natural gas, 57,000 barrels per day (9,100 m3/d) of natural gas condensate, and 300 tons of sulfur per day. The three phases also are designed to produce 800,000 tons of LNG and 750,000 tons of ethane per year

Print Email